Wintergarden & claddings
- Nicole van der Gugten
- Oct 10
- 1 min read
Updated: Nov 10

For this project, the roof of the wintergarden was installed, including support legs and reinforcements. This is the basis for mounting a television. The wintergarden was also connected to the ship.
In addition, the foundation was laid for the smoothing, and preparations were made to reinforce the floor for the installation of bar stools. The deck hatches were aligned and installed. Furthermore, gutters were installed for the LED strips in the wintergarden, and these LED strip gutters have now been installed.
on behalf of Dutch yacht builder









